LotSizingDataModel.Solver
2.0.1
Solver-independent modeling, execution, monitoring and adapter infrastructure.
Loading...
Searching...
No Matches
FlowConstraintModelingNotes.cs
Go to the documentation of this file.
1
namespace
LotSizingDataModel.Solver.Formulation
;
2
3
/// <summary>
4
/// Documents the period conventions used by the standard flow
5
/// formulation.
6
/// </summary>
7
/// <remarks>
8
/// <para>
9
/// Production variables are interpreted as production starts.
10
/// A routing with lead time <c>L</c> started in period <c>t</c>
11
/// reaches its plant warehouse in period <c>t + L</c>.
12
/// </para>
13
/// <para>
14
/// Procurement variables are interpreted as supplier orders.
15
/// A supplier delivery with lead time <c>L</c> ordered in period
16
/// <c>t</c> reaches its destination warehouse in period
17
/// <c>t + L</c>.
18
/// </para>
19
/// <para>
20
/// Transport variables are interpreted as departures. A
21
/// transport quantity leaves the origin in its decision period
22
/// and reaches the destination after the lane lead time.
23
/// </para>
24
/// <para>
25
/// Bill-of-material component consumption occurs in the parent
26
/// production-start period. This convention is deliberately
27
/// independent from the parent routing completion lead time.
28
/// </para>
29
/// </remarks>
30
internal
static
class
FlowConstraintModelingNotes
31
{
32
}
LotSizingDataModel.Solver.Formulation.FlowConstraintModelingNotes
Documents the period conventions used by the standard flow formulation.
Definition
FlowConstraintModelingNotes.cs:31
LotSizingDataModel.Solver.Formulation
Definition
BacklogCostObjectiveTermBuilder.cs:9
LotSizingDataModel.Solver
Formulation
FlowConstraintModelingNotes.cs
Generated by
1.17.0