Mathematical Programming Formulations

Mathematical Programming Formulations

ULSAlgorithms v0.17.0 introduces four solver-independent formulations of the classical deterministic uncapacitated lot-sizing problem.

The four-family taxonomy follows:

N. Brahimi, S. Dauzère-Pérès, N. M. Najid, A. Nordli, "Single item lot sizing problems", European Journal of Operational Research 168(1), 1-16, 2006, DOI 10.1016/j.ejor.2004.01.054.

1. Aggregate inventory-balance formulation

Variables:

  • x[t] >= 0: production quantity;
  • y[t] in {0,1}: setup;
  • I[t] >= 0: end-of-period inventory.

Balance:

\[I_{t-1} + x_t - I_t = d_t. \]

The implementation uses the tight ULS upper bound:

\[x_t \le D_{t,T} y_t, \qquad D_{t,T} = \sum_{k=t}^{T} d_k. \]

Final inventory is fixed to zero by its upper bound.

This formulation is valid for every UlsProblem.

Historical ULS source:

H. M. Wagner, T. M. Whitin, "Dynamic Version of the Economic Lot Size Model", Management Science 5(1), 89-96, 1958, DOI 10.1287/mnsc.5.1.89.

2. Disaggregated / facility-location formulation

q[t,k] denotes the amount of demand in period k produced in period t, with t <= k.

\[\sum_{t=1}^{k} q_{tk} = d_k \]

and

\[q_{tk} \le d_k y_t. \]

The unit coefficient of q[t,k] is the delivered unit cost:

\[p_t + \sum_{r=t}^{k-1} h_r. \]

Zero-demand assignment variables are omitted.

Facility-location reference:

J. Krarup, O. Bilde, "Plant location, Set Covering and Economic Lot Size: An O(mn)-Algorithm for Structured Problems", 1977, DOI 10.1007/978-3-0348-5936-3_10.

3. Regeneration shortest-path formulation

Nodes represent zero-inventory boundaries. A replenishment arc (t,j+1) represents one setup in period t serving demand through period j.

The arc cost is:

\[f_t + \sum_{k=t}^{j} d_k \left( p_t + \sum_{r=t}^{k-1} h_r \right). \]

Zero-demand periods can be crossed through explicit zero-cost skip arcs.

Arc variables are continuous in [0,1]; the formulation is a unit-flow model on an acyclic network.

This formulation is enabled only under the no-speculative-motive condition:

\[p_t + h_t \ge p_{t+1}. \]

Network reference:

W. I. Zangwill, "A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach", Management Science 15(9), 506-527, 1969.

Related efficient Wagner-Whitin implementation:

J. R. Evans, "An Efficient Implementation of the Wagner-Whitin Algorithm for Dynamic Lot-Sizing", Journal of Operations Management 5(2), 229-235, 1985, DOI 10.1016/0272-6963(85)90009-9.

4. Inventory-eliminated formulation

Inventory is substituted algebraically:

\[I_t = \sum_{i=1}^{t} x_i - \sum_{i=1}^{t} d_i. \]

Therefore:

\[\sum_{i=1}^{t} x_i \ge \sum_{i=1}^{t} d_i, \qquad t<T, \]

and final zero inventory is enforced by:

\[\sum_{i=1}^{T} x_i = \sum_{i=1}^{T} d_i. \]

The holding-cost contribution is folded into the production coefficients plus an objective constant. The formulation contains no explicit inventory variables.

Portable modeling layer

The four builders return a UlsFormulation containing:

  • LinearModel;
  • UlsFormulationKind;
  • scientific source description;
  • semantic variable map.

LinearModel is independent of CPLEX, Gurobi, Xpress and CBC. This is the model representation that the solver-execution layer will consume.

Scope

v0.17.0 builds and validates the four formulations but does not yet execute them through a mathematical optimizer.

This separation is intentional: formulation correctness can be tested without requiring any commercial solver installation. The subsequent execution layer will use the automatic solver-selection infrastructure introduced in v0.15.0 and the concrete machine adapters introduced in v0.16.0.