Wagner-Whitin linear-time solver

Wagner-Whitin linear-time solver

Problem variant

WagnerWhitinSolver solves the deterministic single-item uncapacitated lot-sizing problem with zero initial inventory, no backlogging, fixed setup costs, linear production costs, and linear holding costs.

The public solver accepts the classical Wagner-Whitin case and the broader no-speculative-motive class satisfying

\[p_t + h_t \ge p_{t+1} \qquad t=0,\ldots,T-2. \]

Equivalently, the transformed marginal production costs are nonincreasing over time.

Exactness

The solver is exact. A successful call returns UlsSolveStatus.Optimal.

Complexity

  • Time: O(T)
  • Auxiliary working memory: O(T)
  • Output memory: O(T)

Internal working arrays are rented from ArrayPool<T> so repeated use as a subproblem avoids most temporary heap allocations.

Algorithmic implementation

The implementation uses the backward dynamic-programming recurrence through the geometric lower-convex-envelope interpretation of Wagelmans, van Hoesel and Kolen. In the no-speculative-motive case, transformed marginal costs are monotone, so both inserted hull slopes and query coordinates are monotone. The lower envelope can therefore be maintained and queried with an array-backed monotone hull in amortized constant time per period.

The C# code is an equivalent monotone-convex-hull implementation of the linear-time specialization; it is not a line-by-line transcription of the paper pseudocode.

For numerical stability, the recurrence evaluates the covered-demand difference directly instead of subtracting two large line values whenever possible. All cumulative values are checked for finite double results.

Validation strategy

The test suite contains an independent O(T^2) forward dynamic-programming oracle. One thousand deterministic random Wagner-Whitin instances are cross-validated against the linear solver.

The published 12-period example from Wagelmans, van Hoesel and Kolen (1992) is also reproduced. The expected production periods are 1, 3, 5, 8, 10 and 11, and the optimal original objective value is 864.

References

  1. H. M. Wagner and T. M. Whitin (1958). Dynamic Version of the Economic Lot Size Model. Management Science, 5(1), 89-96. DOI: https://doi.org/10.1287/mnsc.5.1.89
  2. J. R. Evans (1985). An Efficient Implementation of the Wagner-Whitin Algorithm for Dynamic Lot-Sizing. Journal of Operations Management, 5(2), 229-235. DOI: https://doi.org/10.1016/0272-6963(85)90009-9
  3. A. Wagelmans, S. van Hoesel and A. Kolen (1992). Economic Lot Sizing: An O(n log n) Algorithm That Runs in Linear Time in the Wagner-Whitin Case. Operations Research, 40(S1), S145-S156. DOI: https://doi.org/10.1287/opre.40.1.S145

Why Evans (1985) is not the public implementation

Evans provides a compact and efficient implementation of the classical Wagner-Whitin dynamic program, but its worst-case running time remains quadratic. Wagelmans, van Hoesel and Kolen subsequently established a linear-time algorithm for the Wagner-Whitin case. Because ULSAlgorithms is intended for intensive reuse as a subproblem library, the public WagnerWhitinSolver uses the later linear-time result.

The quadratic recurrence remains useful as an independent correctness oracle inside the test project.